POTABLE WATER AND RECYCLED WATER FACILITIES

AIR AND VACUUM VALVE DETAILS

  • WA-01 50mm (2") Manual Air Valve (11-03-2006)
  • WA-02 50mm (2") Automatic Combination Air Release and Air/Vacuum Valve Installations (11-03-2006)
  • WA-03 50mm (2") Air and Vacuum Valve Enclosure Locations (11-03-2006)
  • WA-04 100mm (4") Automatic Combination Air Release and Air/Vacuum Valve Installations (12-16-2019)
  • WA-05 150mm (6") Automatic Combination Air Release and Air/Vacuum Valve Installations (12-16-2019)
  • WA-06 100mm & 150mm (4" & 6") Air and Vacuum Valve Enclosure Locations (09-28-2009)
  • WA-07 50mm (2") Below Ground Manual Air Valve in 300mm (12") Can (11-23-2011)
  • WA-08 50mm (2") Automatic Combination Air Release/Vacuum Valve with Blowoff Valve Installation (11-12-2020)

BLOWOFF DETAILS

  • WB-01 50mm (2") Blowoff Installation (07-28-2014)
  • WB-02 100mm (4") Blowoff Installation (07-28-2014)
  • WB-03 150mm (6") Blowoff Installation (07-28-2014)
  • WB-04 Blowoff Installation from End of Mains and from Steel Mains (07-28-2014)
  • WB-05 Temporary 50mm (2") Blowoff Installation (07-28-2014)
  • WB-06 50mm (2") Blowoff Installation in 300mm (12") Can (07-28-2014)   

CATHODIC PROTECTION DETAILS

  • WC-01 Exothermic Weld Detail (03-01-2001)
  • WC-02 Rubber-Ring Joint Bonding Detail for Metallic Pipelines (03-01-2001)
  • WC-03 Buried Mechanical Joint Bonding Detail for Metallic Pipelines (03-01-2001)
  • WC-04 Above Ground Insulating Flange (03-01-2001)
  • WC-05 Buried Insulating Flange Detail (03-01-2001)
  • WC-06 Buried Insulating Flange Test Station Wiring Diagram (07-30-2007)
  • WC-07 Buried Insulated Valve Detail (07-30-2007)
  • WC-08 Not Used
  • WC-09 Two Wire Test Station (03-01-2001)
  • WC-10 Casing Test Station (03-01-2001)
  • WC-11 Single Anode Installation Detail (09-28-2009)
  • WC-12 Prepackaged Magnesium Anode Detail (09-28-2009 )
  • WC-13 Anode Test Station Wiring Diagram (11-12-2020)
  • WC-14 Cathodic Test Station Box (08-03-2018) 
  • WC-15 Reference Electrode Installation Detail (03-01-2001)
  • WC-16 Prepackaged Reference Electrode Detail (03-01-2001)
  • WC-17 New Installation of Sacrificial Anodes for Copper Tubing (12-31-2003)
  • WC-18 Retrofit Installation of Sacrificial Anodes for Copper Tubing (12-31-2003)

FIRE HYDRANT AND FIRE SERVICE DETAILS

  • WF-01 150mm (6") Fire Hydrant Installation (12-16-2019) 
  • WF-02 150mm (6") Fire Hydrant Installation with Break–Off Check Valve (01-26-2022)
  • WF-03 High Pressure Dry Barrel Fire Hydrant Installation (10-28-2016)
  • WF-04 Fire Hydrant Locations and Port Orientation (09-12-2008)
  • WF-05 100mm (4") and Larger Fire Service Installation (09-11-2017) 

GENERAL WATER INFORMATION DETAILS

  • WI-01 Water, Recycled Water and Sewer Main Parallel Separations (03-01-2001)
  • WI-02 Water, Recycled Water and Sewer Main Perpendicular Separations (12-31-2003)
  • WI-03 Water, Recycled Water and Sewer Main Parallel and Perpendicular Separation Notes (11-23-2011)
  • WI-04 Post Meter Constant Pressure Recycled Water Line 75mm (3") Diameter or Less Crossing Potable Water Main or Lateral within Public Right-of-Way (03-01-2001)
  • WI-05 Not Used
  • WI-06 Standard Symbols for Potable and Recycled Water Construction Drawings (11-03-2006)

MISCELLANEOUS WATER DETAILS

  • WM-01 Water Test Station Installation (11-03-2006)
  • WM-02 Water Test Station Enclosure Locations (11-03-2006)
  • WM-03 Retaining Wall for Fire Hydrants and Water and Recycled Water Appurtenances (09-12-2008)
  • WM-04 Protection Post Installation (12-31-2004)
  • WM-05 Demountable Protection Post Installation (12-31-2004)
  • WM-06 Easement/Utility Marker Post Installation (12-31-2004)
  • WM-07 Replacement of Sewer Lateral Crossings (03-01-2001)
  • WM-08 Recycled Water "Do Not Drink" Sign (11-16-2007)

PIPELINE DETAILS

  • WP-01 Warning/Identification Tape and Tracer Wire Installations (12-31-2004)
  • WP-02 Pipe Bedding and Trench Backfill for Potable and Recycled Water Mains (08-03-2018)  
  • WP-03 Cutting and Plugging Abandoned Water, Recycled Water and Sewer Mains (03-01-2001)
  • WP-04 Pipe Casing Installation (03-01-2001)
  • WP-05 Slope Protection Installations (07-30-2007)
  • WP-06 Pipe Protection Pad Installations (03-01-2001)
  • WP-07 Cut - Off Wall Installation in Traveled Areas style (03-01-2001)
  • WP-08 Pipe Encasement for Existing Water Main at Utility Undercuts (09-03-2001)
  • WP-09 Pipe Support for Undercut Sewer Mains (11-01-2002)

BACKFLOW PREVENTION DETAILS    

  • WR-01 19mm through 50mm (3/4” through 2”) Reduced Pressure Backflow Prevention Device (11-12-2020)
  • WR-02 75mm (3") and Larger Reduced Pressure Backflow Prevention Device (11-23-2011)
  • WR-03 25mm and 50mm (1" and 2") Recycled Water Irrigation Check Valve Installation (01-26-2022)
  • WR-04 Recycled Water Irrigation Cross Connection Test Station (01-26-2022)
  • WR-05 Temporary Potable Water to Recycled Water Inter-Connection (03-01-2001)
  • WR-06 75mm (3") or Larger Recycled Water Irrigation Wye Strainer & Check Valve Installation (09-12-2008)
  • WR-07 75mm (3") or Larger Recycled Water Irrigation Cross Connection Test Station (09-12-2008)
  • WR-08 25mm and 50mm (1" & 2") Recycled Water Irrigation Reduced Pressure Backflow Device Installation (08-03-2018) 

WATER SERVICE LATERAL DETAILS

  • WS-01 25mm (1") Water Service Installation (07-28-2014)
  • WS-02 50mm (2") Water Service Installation style (12-31-2003)
  • WS-03 Meter Box Locations for Water and Recycled Water Appurtenances (12-31-2003)
  • WS-04A 75mm (3"), 100mm (4") or 150mm (6") Above Grade Meter Installation (02-11-2020) 
  • WS-04B 75mm (3"), 100mm (4") or 150mm (6") Above Grade Meter Installation - Notes (02-11-2020) 
  • WS-05A 75mm (3"), 100mm (4") or 150mm (6") Meter Installation (02-11-2020) 
  • WS-05B 75mm (3"), 100mm (4") or 150mm (6") Meter Installation - Notes (02-11-2020) 
  • WS-06 Vault Locations for 100mm (4") and Larger Water Services (03-01-2001)
  • WS-07 Existing Water Service Assembly Reconnection (03-01-2001)
  • WS-08 Existing Water Service Abandonment (11-12-2020)
  • WS-09 25mm (1") Duel Domestic/Fire Water Service Installation (11-16-2007)

THRUST AND ANCHOR BLOCKS AND PIPE RESTRAINT DETAILS

  • WT-01A Concrete Thrust and Anchor Block Installations (01-26-2022) 
  • WT-01B Concrete Thrust and Anchor Block Installations - Notes (01-26-2022)
  • WT-01C Concrete Thrust and Anchor Block Installations (01-26-2022)
  • WT-02 Valve Support Blocks (11-16-2007) 
  • WT-03A  Restraint Fitting Support Block (11-12-2020)
  • WT-03B Restraint Fitting Support Block (Cont) (11-12-2020)

VALVE DETAILS

  • WV-01 Gate Well Installation, Type 1 for Valves 100mm (4") and Larger (12-31-2003)
  • WV-02 Gate Well Installation , Type 2 for Valves 100mm (4") and Larger (11-01-2002)
  • WV-03 Gate Well Identification (11-16-2007)
  • WV-04 Steel Valve Stem Extension for Valves 100mm (4") and Larger (08-03-2018) 
  • WV-05 Steel Valve Stem Extension for Valves 50mm (2") and Smaller (7-30-2007)