Login
|
Login
Home
Design Guidelines
1.0 General
2.0 Private Development Projects
3.0 Agency Improvement Projects
4.0 Planning
5.0 Water Pipeline Design
6.0 Sewer Pipeline Design
7.0 Reservoir Design
8.0 Pressure/Flow Control Stations
9.0 Water Pump Station Design
10.0 Sewer Pump Station Design
11.0 Corrosion Control
12.0 Specialized Design
Standard Specifications
Introduction
General Requirements
Site Work
Concrete
Wood and Plastics
Finishes
Equipment
Special Construction
Mechanical
Standard Drawings
Standard Drawings - Water
Potable Water and Recycled Water Facilities
Air and Vacuum Valve Details
Blowoff Details
Cathodic Protection Details
Fire Hydrant and Fire Service Details
General Water Information Details
Miscellaneous Water Details
Pipeline Details
Backflow Prevention Details
Water Service Lateral Details
Thrust and Anchor Blocks and Pipe Restraint Details
Valve Details
Standard Drawings - Sewer
Sewer Facilities
Cleanout Details
Sewer Information
Manhole Details
Pipeline Details
Sewer Service Lateral Details
Approved Materials
Appendices
Home
Design Guidelines
- 1.0 General
- 2.0 Private Development Projects
- 3.0 Agency Improvement Projects
- 4.0 Planning
- 5.0 Water Pipeline Design
- 6.0 Sewer Pipeline Design
- 7.0 Reservoir Design
- 8.0 Pressure/Flow Control Stations
- 9.0 Water Pump Station Design
- 10.0 Sewer Pump Station Design
- 11.0 Corrosion Control
- 12.0 Specialized Design
Standard Specifications
- Introduction
- General Requirements
- Site Work
- Concrete
- Wood and Plastics
- Finishes
- Equipment
- Special Construction
- Mechanical
Standard Drawings
- Standard Drawings - Water
- - Potable Water and Recycled Water Facilities
- - Air and Vacuum Valve Details
- - Blowoff Details
- - Cathodic Protection Details
- - Fire Hydrant and Fire Service Details
- - General Water Information Details
- - Miscellaneous Water Details
- - Pipeline Details
- - Backflow Prevention Details
- - Water Service Lateral Details
- - Thrust and Anchor Blocks and Pipe Restraint Details
- - Valve Details
- Standard Drawings - Sewer
- - Sewer Facilities
- - Cleanout Details
- - Sewer Information
- - Manhole Details
- - Pipeline Details
- - Sewer Service Lateral Details
Approved Materials
Appendices
You are here:
Design Guidelines
Back
INTRODUCTION
Design Guidelines Title Page
(08-23-2019)
Design Guidelines Binder End Sheet
(02-01-2008)
Table of Contents
(04-06-2021)
Updated
Introduction
(12-16-2019)
Signatory Agencies
(12-16-2019)
Technical Review
(09-07-2004)
Standard Terms and Definitions
(09-07-2004)
SECTION 1.0 GENERAL
1.1
Drafting Guidelines
Exhibit 1.1-A:
Standard Hatching and Patterning for Construction Drawings
(09-07-2004)
Exhibit 1.1-B:
Standard Leader Lines for Construction Drawings
(09-07-2004)
Exhibit 1.1-C:
Standard Detail and Section Callouts for Construction Drawings
(09-07-2004)
Exhibit 1.1-D:
Example of Cover Drawing
(09-07-2004)
Exhibit 1.1-E:
Example of Plan and Profile Drawing
(09-07-2004)
Exhibit 1.1-F:
Example of Detail Drawing
(09-07-2004)
1.2
AutoCAD Guidelines
Exhibit 1.2-A:
AutoCAD Plot Style (Mono & Color - Full.CTB)
(04-15-2004)
Exhibit 1.2-B:
Linetypes
(04-15-2004)
1.3 Microstation Guidelines (Future Release)
1.4
Land Acquisition and Disposition
(05-02-2006)
1.5
Easements and Encroachments
(01-11-2012)
1.6
Survey Standards Guideline
(09-07-2004)
1.7
Record Drawing Guidelines
(09-07-2004)
SECTION 2.0 PRIVATE DEVELOPMENT PROJECTS
2.1
Procedural Guidelines
(09-28-2009)
2.2
Development Plan and Permit Processing Procedures
(09-28-2009)
Appendix 2.2A:
Water, Sewer, and Recycled Water Plan Check-Checklist
(01-11-2012)
Appendix 2.2B:
Water Agencies' Notes and Format
(12-16-2019)
Appendix 2.2C:
Engineer's Estimate - Water, Sewer, & Recycled Water
(09-07-2004)
2.3
Water Facility Guidelines
(07-28-2014)
2.4
Sewer Facility Guidelines
(09-07-2004)
2.5
Recycled Water Facility Guidelines
(09-07-2004)
Appendix 2.5A:
Agencies' On-Site Recycled Water Notes
(09-07-2004)
SECTION 3.0 AGENCY IMPROVEMENT PROJECT
3.1
Agency Capital Improvement Projects
(090-7-2004)
3.2
Design Project Progress Submittals
(09-07-2004)
3.3
Submittals (Shop)
(09-07-2004)
3.4
Project Cost Estimates
(05-02-2006)
Appendix 3.4.1:
Sample Cost Estimating Sheet
(05-02-2006)
Appendix 3.4.2:
Sample Summary Sheet
(05-02-2006)
3.5
Technical Specifications
(12-16-2019)
SECTION 4.0 PLANNING
4.1
Water Planning
(07-28-2014)
Figure 4-1-1:
Peak Hour Demand Peaking Factor Curve
(09-07-2004)
Figure 4-1-2:
Maximum Day Demand Peaking Factor Curve
(09-07-2004)
Figure 4-1-3:
Water Agencies Map
(07-28-2014)
Figure 4-1-4:
Pressure Criteria
(09-07-2004)
4.2
Sewer Planning
(07-28-2014)
Figure 4-2-1:
Ratio of Peak Flow to Average Daily Flow
(090-7-2004)
Figure 4-2-2:
Sewer Diurnal Curve
(09-07-2004)
4.3
Recycled Water Planning
(09-07-2004)
4.4
Sub-Area Master Plan Development
(09-07-2004)
4.5
Environmental Review
(09-07-2004)
4.6
National Pollutant Elimination System (NPDES)
(09-07-2004)
4.7
Other Agency Permits
(05-02-2006)
SECTION 5.0 WATER PIPELINE DESIGN
5.1
Pressure Pipeline Design
(01-11-2012)
5.2
Thrust Restraint and Anchor Blocks
(01-11-2012)
5.3
Line Valves Selection and Placement
(09-26-2007)
5.4
>Fire Hydrant and Fire Services
(10-11-2013)
5.5
Air Valves
(09-07-2004)
5.6
Blowoffs
(09-07-2004)
5.7
Water Services and Test Stations
(09-07-2004)
SECTION 6.0 SEWER PIPELINE DESIGN
6.1
Gravity Sewer Pipeline Design
(09-07-2004)
6.2
Sewer Manholes and Cleanouts
(09-07-2004)
6.3
Sewer Laterals
(09-07-2004)
6.4
Pressure Systems (Force Mains)
(05-02-2006)
SECTION 7.0 RESERVOIR DESIGN
7.1
Storage Facilities
(05-02-2006)
7.2 Seismic Sensing Devices (Future Release)
SECTION 8.0 PRESSURE/FLOW CONTROL STATIONS
8.1
Pressure/Flow Control Stations
(05-02-2006)
8.2
Vaults
(09-28-2009)
8.3
Agency Interconnections
(01-11-2012)
Exhibit 8.3A:
Agency Interconnections Sample Agreement
(01-11-2012)
SECTION 9.0 WATER PUMP STATION DESIGN
9.1
Water Pump Station Design
(05-01-2007)
9.2
Structural Guidelines
(05-01-2007)
9.3
Noise Control Guidelines
(05-01-2007)
SECTION 10.0 SEWER PUMP STATION DESIGN
10.1
Sewage Pump (Lift) Station Design
(02-01-2008)
10.2
Surge Control / Analysis
(02-01-2008)
SECTION 11.0 CORROSION CONTROL
11.1
Pipeline Corrosion Control Systems
(02-01-2008)
11.2
Reservoir Corrosion Control Systems
(02-01-2008)
SECTION 12.0 SPECIALIZED DESIGN
12.1
Bridge Crossings
(05-02-2006)
12.2
Trenchless Construction
(09-28-2009)
12.3
Pipe Bursting
(05-02-2006)
12.4
Railroad and Freeway Crossings
(05-02-2006)
12.5
Pipeline Rehabilitation
(05-01-2007)
12.6
Temporary Above Ground Piping
(Water) (05-02-2006)
12.7
Temporary By-pass Requirements
(Sewer) (05-02-2006)
12.8
Facility Security Guidelines
(09-12-2008)
12.9
Quagga Mussel
(01-11-2012)
12.10
Stormwater Treatment Facilities Requirements
(04-06-2021)
NEW
APPENDICES